Tecnalia – WTURBO Wind Turbine Power Train Digital Twin
Tecnalia – WTURBO Wind Turbine Power Train Digital Twin Tecnalia Sector: Energy Business Case Operation and maintenance (O&M) costs represent 25 to 35% of the LCOE (levelised cost of energy) of wind turbines. Corrective maintenance is responsible for 30 to 60% of O&M costs. This challenge involves developing a digital twin for the electrical components […]
Tecnalia – WTURBO Wind Turbine Power Train Digital Twin Read More »